How to plan repair?
How many programs on TV devoted to repair! How about writing and speaking. So why are almost always repair turns into a disaster? Repair - is work. And as any action, it must be planned at least two steps ahead.
Surprisingly, despite the huge amount of advice and teachings from the outside, people still make some errors in the sequence of repairs, that always leads to higher material and moral costs.
So. We can distinguish two types of repairs carried out in the residential and administrative buildings:
- major repairs
- redecorating
Capital is the redevelopment, replacement windows, plumbing, wiring. This repair is usually carried out during the warm season.
Cosmetic Wallpapering, painting, new doors, locks, new faucets in the bathroom and things like that. Cosmetic work may be held at any time of year, as it does not depend on the ambient temperature.
There follows a sequence of different species works to repair. If you violate it may be spoiled what has been updated.
replacement windows. It is important to consider how new windows in the subsequent washing, especially Deaf openings. Windows with a balcony you can make the deaf, but no balcony is always convenient to make wings.
Plumbing replacement of pipes, plumbing, bathroom tiles.
Installation supply and exhaust devices (if any), cleaning and layout of ventilation ducts (especially true for houses).
Wiring considering the future location of powerful elektropotreblyayuschih devices, taking into account the placement of lights and switches. Typically, wiring for Accommodation is in Stroebe (channels in the wall, which then render over). In the office buildings of special wires lead to narrower conduits but it is less aesthetically pleasing. Also at this point the walls are installed cups (or the same box) under the sockets and switches.
alignment of walls, floors, blur / painting ceilings.
plaster - in this wet of bulk materials and dust come to an end.
Wallpapering, painting batteries slopes of windows (if it is necessary).
mounting sockets, switches, hanging doors.
laying flooring, laying baseboards.
course, the work of some items may be produce a different sequence. Importantly, should not be violated rule: all work is carried out in order to reduce pollution of the environment.
Also it is logical that the first are more ambitious work, and then finish. Many technologies may take some time, for example, for drying. To do not waste time and not collide with the desire to be quick to put a layer on the wet surface, you should switch attention to another type of repair work.
Based on the sequence of the repair, you can navigate the procurement of necessary materials. For example, optional and not have to buy everything at once. In the first stage usually requires cement, stucco, plaster, so the wallpaper (so they do not take up too much space and does not hang out under your feet) can be buy later.
In the end, I would say that the repair is always dirty and monetary costs. But what could be nicer than the efforts to improve and decorate own home?
Successful repair you!
Source: shkolazhizni.ru